Projects
Some of our recent projects
Biogen, BMC1 & BMC2, Luterbach, Switzerland
STS was appointed for the Electrical & Instrumentation fit-out of two production buildings, MV Substations, utility buildings and generators in the new Biogen Biopharmaceutical campus. This Biogen facility in Luterbach,...
Read More
Confidential Client, Data Centre Project 03, Dublin, Ireland
STS was appointed to carry out the electrical installation for this Dublin based project. The Installation was delivered in accordance with the client’s schedule and commercial expectations. Our scope of...
Read More
220kV GIS Substation, Dublin, Ireland
STS have completed the turnkey construction of a 220kV GIS Substation for a confidential data center client in Dublin . The scope of this project included: Prepare and submit planning...
Read More
Biogen MV Generator Project, Luterbach, Switzerland
STS were appointed as the Design and Build contractor for 2no. New MV generators as part of the Biogen Next Generation Project. The scope of this project included: 2 no....
Read More
Dublin Airport Fit Out Projects, Dublin, Ireland
Specialist Technical Services were contracted to carried out works on the Aerlingus Executive Lounge & WH Smyths at Dublin Airport. The Scope of Works included the following: Modification & extension...
Read More
Joe Radio Studio Fit Out, Brussels, Belgium
Specialist Technical Services were appointed to manage the Design, Fit-Out and Commissioning for Joe Radio Studios and Offices. The scope of work included the following: Design and Build MEP Fitout...
Read More
WeWork Office Fit Out, Spittlemarkt, Berlin, Germany
Specialist Technical Services were appointed to manage the design, fit out and commissioning of the We Work Spittlemarkt Offices. The full scope for these works included: Design and Build MEP...
Read More
Pharmaceutical Office Fit Out, Athlone, Ireland
STS Group were contracted on a PSCS Role for the following scope of works: M&E Design Containment Supply and Installation LV Cabling Supply and Installation Lighting & Emergency lighting supply...
Read More
WeWork Office Fit Out, Harcourt Road, Dublin, Ireland
Specialist Technical Services were appointed to manage the design, fit out and commissioning of on Harcourt Road, Dublin. The full scope for these works included: Design and Build Architectural and...
Read More
WeWork Office Fit Out, MTV, Berlin, Germany
Specialist Technical Services were appointed to manage the design, fit out and commissioning of the MTV We Work Offices in the centre of Berlin. The full scope for these works...
Read More
WeWork Office Fit Out, Charlemont Exchange, Dublin, Ireland
Specialist Technical Services were appointed as main contractor to manage the design, fit out and commissioning of WeWork Charlemont Exchange, Dublin. The full scope for these works included: Design and...
Read More
WeWork Office Fit Out, Stresemannstrasse, Berlin, Germany
Specialist Technical Services were appointed to manage the design, fit out and commissioning of the We Work Offices Stresemannstrasse in the centre of Berlin. The full scope for these works...
Read More
Cloghran, Phase 2 & 3, 110kV AIS extension, Dublin, Ireland
STS were contracted for the works on Phase 2 & 3 of Project Cloghran, an extension to a 110kV AIS substation located in Dublin. The scope of this project included:...
Read More
18.2MW MV Gas Powered Plant, Dublin, Ireland
Turnkey installation of an 18.2 MW Gas Generation Plant for temporary MV power to a confidential Clients Data Centre. The scope of this project included:: System Design. Enclosed 15mtr high...
Read More
Client Control Building & 3rd MV Transformer, Dublin, Ireland
STS Group provided the following scope of services with regards to our confidential clients control building & 4 bay transformer yard project. The scope of this project included: Purchase, Install,...
Read More
Confidential Client, Project ABC, Kildare, Ireland
STS have been appointed contractors for the Electrical & Instrumentation installation of the new beverage concentrate facility in Newbridge. The scope of work includes: Provide and install primary and secondary...
Read More
Ickx Expansion, Essen, Belgium
Specialist Technical Services were contracted to carry out the Electrical scope associated with the Ickx Expansion at their facility in Essen. The scope of work included the following: Supply &...
Read More
Kerry Ingredients Dryer Project, Cork, Ireland
Specialist Technical Services were contracted to carry out the Electrical and Instrumentation scope associated with the Kerry Ingredients Dryer Project at their facility in Charleville. The scope of work included...
Read More
Irish Distillers Limited, Cork, Ireland
Specialist Technical Services were contracted to carry out Electrical works associated with the construction of a new Maturation Warehouse Facility adjacent to the existing facility. The scope of work included...
Read More
Confidential Client, Data Centre 061 Phase 2, Abu Dhabi, UAE
STS was appointed to carry out the mechanical and electrical installation for the second phase of this Data Centre project in Abu Dhabi, UAE for a confidential client. The supply...
Read More
Confidential Client, Data Centre Project, Manama, Bahrain
STS was appointed to carry out the electrical installation for this Data Centre project in Manama, Bahrain. The installation is from green field sites to fully completed Data centre for...
Read More
Confidential Client, Colo Projects, Paris, France
Design and set out of cable containment routes based on rack drawing received from client Interfacing with client and co-location providers to ensure co-ordination of services A crucial point of...
Read More
Confidential Client, Infills Project 054, Southhall, UK
Design and set out of cable containment routes based on rack drawing received from client Interfacing with client and co-location providers to ensure co-ordination of services A crucial point of...
Read More
Confidential Client, Data Centre, 3 Sites, Sweden
STS was appointed to carry out the electrical installation for 3 No. Data Halls in Sweden. The sites are located at Vasteras, Eskilstuna and Katrineholm and have an expected duration...
Read More
Confidential Client, Colo Projects, Milan, Italy
Design and set out of cable containment routes based on rack drawing received from client Interfacing with client and co-location providers to ensure co-ordination of services A crucial point of...
Read More
Confidential Client, MOD 2 & 3, Frankfurt, Germany
STS has been appointed as the general contractor for this project based in Frankfurt. The following scope of work relates to the final two of three phases of the project....
Read More
Confidential Client, Rapid Deployment Data Centre, Madrid, Spain
STS was appointed as electrical contractor associated with the build of a Rapid Deployment Data centre for our confidential Client in Madrid. Our scope of work included the following: Installation...
Read More
Confidential Client, SH4 Data Center, Rafz, Switzerland
STS was appointed as the electrical contractor associated with a large-scale fast-track Data Centre for our confidential client, in Rafz. The electrical scope of work included the following: MV Power...
Read More
Regeneron, Capital Works Programme, Limerick, Ireland
Regeneron acquired the old Dell Facility in Limerick, Ireland and upgraded the premises into a state of the art Bio Pharma Facility. STS were contracted for 4 No. Projects covering...
Read More
Sanofi, mAbs Project, Geel, Belgium
STS was appointed for the electrical and instrument fit out for the Sanofi MABs Project. This biotech facility project is located in the Sanofi plant in Geel, Belgium. This facility...
Read More
Merck, K2 Project, Cork, Ireland
STS was appointed as the electrical and instrumentation contractor for Merck’s K2 project. The main portion of the development consists of installing a new air casting machine ‘K2’ to manufacture...
Read More
Pfizer, Xeljanz New Processing Suite, Kildare, Ireland
STS was appointed as the electrical and instrumentation contractor for Pfizer’s Xeljanz Processing Suite project at their Newbridge campus Co. Kildare. Scope of services include: Containment Main Distribution Sub-Mains Distribution...
Read More
MSD, SFFD & CUB Project, Boxmeer, Netherlands
MSD Animal Health Netherlands constructed a new Sterile Filling & Freeze Drying Building (SFFD) facility in Boxmeer coupled with a new Central Utilities Building (CUB). The SFFD building will be...
Read More
Janssen Biologics, BioCork2, Cork, Ireland
Janssen Sciences Ireland UC expanded its existing facility at Ringaskiddy, Co. Cork with the construction of a new production building. The new Biopharma production building was constructed adjacent to the...
Read More
Lonza, NSYNC Project, Visp, Switzerland
Lonza announced the addition of two new Ibex Solutions offerings to its existing 100,000M2 Biopharmaceutical Manufacturing Complex in Visp, Switzerland. The project consisted of three main areas including production facilities,...
Read More
TEVA, Project Genesis, Ulm, Germany
STS have been appointed to carry out the full Instrumentation scope for the TEVA Genesis Project in Ulm, Germany. This is the second phase of a very large Bio-Pharmaceutical project....
Read More
CSL Behring, New Production Facility, Lengnau, Switzerland
STS was appointed to carry out the Electrical & Instrumentation fit-out of CSL Behring's New Production Facility in Lengnau. The project was unique in so far as the majority of...
Read More