TEVA, Project Genesis, Ulm, Germany

STS have been appointed to carry out the full Instrumentation scope for the TEVA Genesis Project in Ulm, Germany. This is the second phase of a very large Bio-Pharmaceutical project. The Instrumentation works package includes the following:

  • Installation of Control Systems Cabinets & Operator Stations (DCS, BAS, BMS)
  • Installation of BAS/BMS Instruments / Valves
  • Installation of Access Control & Door Interlocking Systems
  • Installation of Anti-Intrusion System
  • Installation of CCTV System
  • Supply & Installation of Clock System
  • Installation of Fire Detection System
  • Supply & Installation of Office & Process Networks (Including Active Switches)
  • Supply & Installation of Data & Instrument Cable Trays/Conduits
  • Installation of Network Cables (Including F.O.)
  • Supply & Installation of Low Voltage & Fire Detection Systems Cables
  • Installation of Control Cables for Analog/Digital Signal
  • Supply & Installation of Cables for Field Power Supplies
  • Supply & Installation of Air Distribution & Pneumatic Connections
  • Installation of Field Instruments
  • Testing & Commissioning

 

 

Quick Facts

Duration
16 months
Team
Wood
Nature of Facility
Pharmaceutical
Peak Labour
150