MSD Animal Health Netherlands constructed a new Sterile Filling & Freeze Drying Building (SFFD) facility in Boxmeer coupled with a new Central Utilities Building (CUB). The SFFD building will be used to manufacture existing products with room to install new filling lines complete with lyophilisers. Two filling lines and 4 lyophilisers were installed initially with fallow space allowed for Phase 2.
STS was awarded the Electrical and Instrumentation Contract which was split as follows:
- SFFD Building electrical installation (PE005)
- SFFD Building instrumentation installation (PE005)
- CUB Building electrical installation (PE010)
- CUB Building instrumentation installation (PE010)
 
 
                                     
                                    
                                        Quick Facts
                                                
                                                
Duration
                                                    12 months                                                
                                                
                                                
                                                
Team
                                                    PM Group                                                
                                                
                                                
                                                
Nature of Facility
                                                    Pharmaceutical                                                
                                                
                                                
                                                
Peak Labour
                                                    130