STS Group has been appointed as the GC2 for this Didcot based project. The scope includes the full CSA, Mechanical and Electrical fitout associated with our client’s data center campus. This is the second phase of the project, STS Group previously delivered the MEP scope for phase 1.
- Installation and management of the OFCI equipment
- BMS equipment cabling & terminations
- Cable Support Systems
- MV / LV Cabling and associated terminations
- Emergency / Normal Lighting & Small power systems
- Fire Alarm systems (incl. Vesda systems)
- Security containment and cabling
- Power Busbar systems
- Earthing systems
- Structured Wiring Installation, Discrimination studies
- Supply & installation of CRAC units – Pipework, heat recovery unit and associated ductwork
- Supply & installation of Air motorised Mechanical dampers
- Offloading, positioning and installing Air Units, Extract Fans
- Diesel Storage Tank & Pipework
- Installation of Air Systems
- Supply & installation of AHU’s and ductwork fire dampers, volume control dampers, attenuators, diffusers, grilles, and insulation.
- Supply & Install of the: Condensate pipework, ceiling and wall mounted air conditioning units
- Supply & Install of the: Wall mounted split system air conditioning units.
- Supply & Installation of the Cold Storage Tank – Pump & pipework
- CSA Fitout
- Commissioning of Data Centre
Quick Facts
Duration
4 months
Team
Confidential
Nature of Facility
Data Centre
Peak Labour
120