STS were contracted for the works on Phase 2 & 3 of Project Cloghran, an extension to a 110kV AIS substation located in Dublin.
The scope of this project included:
- Design and submittal process with Eirgrid/ESB on all equipment with ESB.
- 3 No. 110/20kV 35MVA transformers, CTs/VTs and NERs.
- Installation of LLE Equipment incl Transformer offloading and assembly.
- Steel Work & Busbar.
- Earthing.
- Control Cabling.
- Containment.
- Protection Equipment.
- 20KV Busbar.
- Interface Kiosk.
- Access Control & CCTV.
- AC Distribution & General Services.
- Heating & Cooling.
- Lighting.
- Fire Alarm.
- Lightning Protection.
- BMS / EMPS.
- Surge Arrestors.
- Supporting Steel Work.
- 20kV Conductor.
- Commissioning.