Turnkey installation of an 18.2 MW Gas Generation Plant for temporary MV power to a confidential Clients Data Centre.
The scope of this project included::
- System Design.
- Enclosed 15mtr high acoustic barrier built around the generation plant to meet strict sound level emissions criteria
- Supply of 12no. 1.925MVA natural gas generators providing 1.54 MW Gross Electrical Output
- Civil, MV & MEP Installations
- Containerized control room for automated control and monitoring of plant
- Power Management System centralized control room
- Commissioning of Plant
- Operation of Plant
- Decommission plant once permanent MV power was available to site