Cloghran, Phase 2 & 3, 110kV AIS extension, Dublin, Ireland

STS were contracted for the works on Phase 2 &  3 of Project Cloghran, an extension to a 110kV AIS substation located in Dublin.

The scope of this project included:

  • Design and submittal process with Eirgrid/ESB on all equipment with ESB
  • 3 No. 110/20kV 35MVA transformers, CTs/VTs and NERs
  • Installation of LLE Equipment incl Transformer offloading and assembly
  • Steel Work & Busbar
  • Earthing
  • Control Cabling
  • Containment
  • Protection Equipment
  • 20KV Busbar
  • Interface Kiosk
  • Access Control & CCTV
  • AC Distribution & General Services
  • Heating & Cooling
  • Lighting
  • Fire Alarm
  • Lightning Protection
  • BMS / EMPS
  • Surge Arrestors
  • Supporting Steel Work
  • 20kV Conductor
  • Commissioning

Quick Facts

Duration
16 months
Team
Confidential
Peak Labour
50