Confidential Client, Colo Projects, Milan, Italy

  • Design and set out of cable containment routes based on rack drawing received from client
  • Interfacing with client and co-location providers to ensure co-ordination of services
  • A crucial point of this process involves detailed planning with both parties on when power will be required from the co-location provider to ensure  energisation dates are met
  • Supply and installation of cable containment (basket) and associated bracketry
  • Supply and installation of PDU panels and mains cabling to same
  • Termination of ATSC power supplies
  • Supply and installation of whip cable and 32 amp sockets for rack power supplies
  • Termination and testing of all cabling
  • O&M compilation

Quick Facts

Duration
6 months
Team
Confidential
Nature of Facility
Data Centre
Peak Labour
40