MSD, SFFD & CUB Project, Boxmeer, Netherlands

MSD Animal Health Netherlands constructed a new Sterile Filling & Freeze Drying Building (SFFD) facility in Boxmeer coupled with a new Central Utilities Building (CUB). The SFFD building will be used to manufacture existing products with room to install new filling lines complete with lyophilisers. Two filling lines and 4 lyophilisers were installed initially with fallow space allowed for Phase 2.

STS was awarded the Electrical and Instrumentation Contract which was split as follows:

  • SFFD Building electrical installation (PE005)
  • SFFD Building instrumentation installation (PE005)
  • CUB Building electrical installation (PE010)
  • CUB Building instrumentation installation (PE010)

 

 

Quick Facts

Duration
12 months
Team
PM Group
Nature of Facility
Pharmaceutical
Peak Labour
130